Tuesday, November 25, 2014

Bann Nah 9 - Foundation and Beams

After all the power line electrical work was done and after the post-raising ceremony, Lott and Naht set to setting the nine cement posts and bonding them to the column footers. Once this was done, they prepared the main horizontal floor beams at our village home. When they were done, we had the nine vertical concrete posts placed three meters apart and nine horizontal floor beams bolted to the posts.

Shots of the cement foundation posts being set:





Shots of the main floor beams installed: