Saturday, June 4, 2016

Bann Nah 36 - Trim, Railings and Balluster

While I was away visiting family and friends in the USA, our workers finished up the one remaining inside wall of “yellow wood” and did the trim work for the entire inside.



When I returned to Thailand, Sam Lott and Sam Naht had completed all the inside work and had moved on to working on the porch handrails and balluster, which, like the stairs, were partly designed by our head monk, Lungpaw Boon Long.





One problem that they had encountered was that the mae sak (teak) originally bought for the balluster had split badly when it dried. I suspect the wood pile should have been placed in more shade, but what was done was done.

Once the porch railings and balluster went in, the beauty of the porch was even more enhanced. Not only that, but the railings were super strong. Combined with the inside trim work, Bann Nah was really shaping up and I could finally see the light at the end of the tunnel for Phase One (the main house) construction.




No comments: